Shenzhen Airport APM

Profile information:
ShenzhenAirportAPMisplannedtotransportpassengersfromTerminal3toSatelliteHallandTerminal4(long-termplan)andequippedwithO&Mcenterandotherrelatedfacilitiesunderground.ThewholelinewithT3,SatelliteHall,T4(
basic information
Categories:
SH
Release time:
2018-11-12
heat
没有此类产品
Product description

  Shenzhen Airport APM is planned to transport passengers from Terminal 3 to Satellite Hall and Terminal 4 (long-term plan) and equipped with O&M center and other related facilities under ground. The whole line with T3, Satellite Hall, T4 ((long-term plan) and a depot has been well designed. The project will be carried out in two phases and the 1st phase covers T3, Satellite Hall and the depot. The line is located on the basement with 2.6-km mainline and 1-km entrance & exit depot line.

 

  Revenue service with 18 cars is scheduled to be achieved by the end of 2020.